Vestas V164 Offshore Wind Turbine Launch

Introducing the Vestas V164 – 7.0 MW

It’s Big – Its Massive – It’s Gigantic

Lowering the cost of energy offshore is Vestas’ statement

MHI Vestas V164 Aerial shot copyright MHI Vestas compressed Vestas V164 Offshore Wind Turbine Launch
Image courtesy of MHI Vestas Offshore Wind

This offshore turbine has been designed with two guiding principles in mind: firstly, this new generation of offshore turbines is intended to require as little maintenance as possible. Secondly, when servicing is required, it should be as safe, quick and cost efficient as possible.

For Wind Power Enthusiasts, the new Vestas V164 – 7 Megawatt wind turbine, the V164, will be an amazing sight to look at. A single blade measures more than 9 London Doubledecker Buses. That’s 80 meters. The total diameter of the Turbine is larger then the world famous London Eye and the total rotating area of the blade is roughly 3 times the area of Wembley Stadium. Once the turbine is built, a prototype is scheduled for Q4 of 2012, it is likely to be the world largest wind turbine, beating the current record holder Enercon E126. There are speculations that the turbine will be built in the UK after Vestas hinting it may set up a new production facility there.

With the V164-7.0 MW Vestas introduces design choices to drive profitability to new levels in offshore wind:

Maximizing the amount of energy capture, not only with the huge rotor diameter of 164m but also through an optimal rotor to generator ratio.

 

vestas v164 7 0 mw offshore wind turbine11 Vestas V164 Offshore Wind Turbine Launch
Images courtesy of MHI Vestas Offshore Wind

 

Reducing operations and maintenance costs by enabling customers to run fewer, larger turbines

Reducing the scale and risk of investment required, as fewer turbines also mean fewer foundations and less cabling

Maximizing the return on investment thanks to the 25-year structural life of the Vestas V164 -7.0 MW – outstanding by industry standards. This gives you a longer period to generate energy and adds to your business case certainty.

Construction of the first V164-7.0 MW prototypes is expected in Q4 2012. Serial production is set to begin in Q1 2015 provided a firm order backlog is in place to justify the substantial investment needed to develop the new production and assembly facilities required for a turbine of this size.

Based on the potential market size, the V164-7.0 MW business case is based on Europe and primarily the Northern European markets. Should market demand require so Vestas is however also prepared to take the V164-7.0 MW to other parts of the world in due time.

 

 

vestas v164  7 0 mw offshore wind turbie nacelle11 Vestas V164 Offshore Wind Turbine Launch
Image courtesy of MHI Vestas Offshore Wind

DOWNLOAD VESTAS V164-7.0mW BROCHURE

vestas v164_70_mw-wind-turbine.pdf

More about the turbine from Vestas